Terms and Conditions

  • Prices are subject to change without prior notice. It can go down or even rise, depending on our situation here and the time you give us for this work.
  • All prices do not include tax.
  • SKYE will make a contract of cooperation before all the work begins. The maximum contract period for houses and boarding houses is 3 (three) months, other building is 6 (six) months.
  • SKYE will issue an invoice for down payment after the contract has been signed by both side. SKYE will start working after down payment is received.
  • SKYE will propose the system that will be designed. Client must first approve the system design to be worked on.
  • If there is a system change in the design that has been approved by the client during the work period, it will incur costs that will be discussed in advance.
  • All drawing files should be in .dwg files and will be stored in USB flashdisk or DVD ROM. If client ask for hardcopy, we can print it in A3 size with additional cost. BoQ files should be in .xlsx files and will be stored in the same storage as the drawings.
  • SKYE does not take care of all permits required for development.
  • If there are other things outside this terms and conditions, it will be stated in the contract of cooperation.

Termins

For House / Boarding House

  1. 50% Down payment.
  2. 30% Design Development Design stage.
  3. 20% Final Design after 2 times revision.

For Hotels / Hostel / Inn / Apartment / Dormitory

  1. 30% Down payment.
  2. 30% Schematic Design stage.
  3. 30% Design Development stage.
  4. 10% Final Design stage after 2 times revision.

For Office Building

  1. 30% Down payment.
  2. 30% Schematic Design stage.
  3. 30% Design Development stage
  4. 10% Final Design stage after 2 times revision.